The mission begins with your Plane in flight.
-
Continue flying and about 80 nautical miles from the destination airport expect istruction from the Air Traffic Control for the assigned approach plate. .
-
Arrival runway depends by weather condition but you have an option to change the arrival runway by using the ATC options
-
Land and taxi to the gate
Gimpo Intl (RKSS) |
|
|
|
ATIS |
126.400 MHz |
Clearance Delivery |
122.600 MHz |
Clearance Delivery |
125.850 MHz |
Ground |
121.250 MHz |
Ground |
121.900 MHz |
Ground |
121.950 MHz |
Tower |
118.050 MHz |
Tower |
118.100 MHz |
Departure |
119.050 MHz |
Departure |
123.250 MHz |
Departure |
123.800 MHz |
Departure |
124.800 MHz |
Departure |
125.150 MHz |
Approach |
119.750 MHz |
Approach |
119.900 MHz |
Approach |
120.650 MHz |
Approach |
120.800 MHz |
Approach |
125.500 MHz |
|
|
Latitude |
N37*33.42' |
Longitude |
E126*47.85' |
Elevation |
58 FT |
Runway |
Length |
Surface |
ILS_ID |
ILS_Freq |
ILS_Hdg |
14L |
11820 |
Asphalt |
ISEL |
109.900 |
143 |
32R |
11820 |
Asphalt |
ISKP |
110.700 |
323 |
14R |
10493 |
Asphalt |
IOFR |
108.700 |
143 |
32L |
10493 |
Asphalt |
IKMO |
108.300 |
323 |